Plant:
- Coal-fired, 4 x 550MW, located in the UK
Problem:
- Explosive ejection of a governor valve due to progressive bolt failures
- History of individual bolt failures on comparable units
![](http://johnbrear-plantintegrity.com/wp-content/uploads/2019/01/DSCI0290-b.jpg)
Solution:
- Multi-disciplinary investigation of the failure, in the context of utility-wide bolt experience
Benefits:
- Mechanical, metallurgical and compositional factors identified
- Revisions to design, heat treatment and detailed chemistry recommended
- Major revision to bolt life management procedure implemented, and rolled-out to other utilities and operators