Plant:
- A 250MW combined-cycle plant in the UK
Objective:
- Assess the effects of changing from base load to cyclic operation
- Optimise plant operation
- Identify any necessary engineering or operational changes, with particular attention to condensate problems
Solution:
- Identification of critical components
- Inspection and condition assessment
- On-line monitoring of operational conditions, with periodic off-line analysis
- Inverse design stress, creep and fatigue analysis, refined by finite element stress analysis where necessary
Benefits:
- Critical components identified, and monitoring programmes established
- Particular trouble spots identified
- Current condition of critical components demonstrated to be satisfactory
- Typical operational transients identified and analysed
- Component lives calculated, and refined by FEA as appropriate
- Design and operational factors relating to vent and drain function, condensate formation during purge cycles and start-up/shut-down procedures identified and modifications proposed