{"id":906,"date":"2019-01-20T22:27:02","date_gmt":"2019-01-20T22:27:02","guid":{"rendered":"http:\/\/johnbrear-plantintegrity.com\/?page_id=906"},"modified":"2019-01-21T00:48:09","modified_gmt":"2019-01-21T00:48:09","slug":"rbi-at-the-design-stage","status":"publish","type":"page","link":"https:\/\/johnbrear-plantintegrity.com\/?page_id=906","title":{"rendered":"RBI at the design stage"},"content":{"rendered":"<figure id=\"attachment_907\" aria-describedby=\"caption-attachment-907\" style=\"width: 410px\" class=\"wp-caption alignright\"><img fetchpriority=\"high\" decoding=\"async\" src=\"http:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/slug-catcher.png\" alt=\"\" width=\"410\" height=\"310\" class=\"size-full wp-image-907\" \/><figcaption id=\"caption-attachment-907\" class=\"wp-caption-text\">Slug catcher, similar to those at the subject plant<\/figcaption><\/figure>\r\n<p><strong>Plant:<\/strong><\/p>\r\n<ul>\r\n    <li>A gas treatment plant, in the Middle East, during the final stages of design<\/li>\r\n<\/ul>\r\n<p><strong>Objective:<\/strong><\/p>\r\n<ul>\r\n    <li>To assist the plant constructor to provide the operator with a risk based inspection plan for all plant items subject to corrosion<\/li>\r\n    <li>The initial plan to be based on design data, but adaptable to reflect actual corrosion experience in-service<\/li>\r\n<\/ul>\r\n<p><strong>Approach:<\/strong><\/p>\r\n<ul>\r\n    <li>Review of existing design data, hazard analyses and corrosion calculations<\/li>\r\n    <li>Development of a probabilistic model of the expected corrosion processes, under normal and fault conditions<\/li>\r\n    <li>Development of a risk based inspection plan using the probabilistic corrosion model and the existing semi-quantitative consequence estimates, making allowance for areas of potential full or partial redundancy in the system<\/li>\r\n<\/ul>\r\n<p><strong>Benefits:<\/strong><\/p>\r\n<ul>\r\n    <li>A risk hierarchy for all components in the plant<\/li>\r\n    <li>A grouping of components according to optimal inspection intervals<\/li>\r\n    <li>A method for re-setting inspection intervals depending on the relationship between observed in-service corrosion and the <em>a priori <\/em>estimates<br \/>\r\n    <\/li>\r\n<\/ul>\r\n","protected":false},"excerpt":{"rendered":"<p>Plant: A gas treatment plant, in the Middle East, during the final stages of design Objective: To assist the plant constructor to provide the operator with a risk based inspection plan for all plant items subject to corrosion The initial plan to be based on design data, but adaptable to reflect actual corrosion experience in-service &hellip; <a href=\"https:\/\/johnbrear-plantintegrity.com\/?page_id=906\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">RBI at the design stage<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":165,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-906","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=906"}],"version-history":[{"count":1,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/906\/revisions"}],"predecessor-version":[{"id":908,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/906\/revisions\/908"}],"up":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/165"}],"wp:attachment":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}