{"id":524,"date":"2019-01-12T20:50:26","date_gmt":"2019-01-12T20:50:26","guid":{"rendered":"http:\/\/johnbrear-plantintegrity.com\/?page_id=524"},"modified":"2019-01-18T20:49:04","modified_gmt":"2019-01-18T20:49:04","slug":"seismic-qualification-of-pwr-components","status":"publish","type":"page","link":"https:\/\/johnbrear-plantintegrity.com\/?page_id=524","title":{"rendered":"Seismic qualification of PWR components"},"content":{"rendered":"<p>&#160;<figure id=\"attachment_525\" aria-describedby=\"caption-attachment-525\" style=\"width: 400px\" class=\"wp-caption alignright\"><img fetchpriority=\"high\" decoding=\"async\" src=\"http:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/Sizewell-air.jpg\" alt=\"\" width=\"400\" height=\"278\" class=\"size-full wp-image-525\" srcset=\"https:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/Sizewell-air.jpg 400w, https:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/Sizewell-air-300x209.jpg 300w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><figcaption id=\"caption-attachment-525\" class=\"wp-caption-text\">Sizewell power stations - Nuclear electric photo<\/figcaption><\/figure>&#160; This project involved seismic qualification of over-pressure release doors, air filter units and other equipment to ensure continued fitness for service following a postulated seismic event.<br \/>\r\n<br \/>\r\nInitial investigation showed the components to suitable for analytical assessment using hand calculations.&#160; Thus a cost effective solution was identified early in the assessment process and it was confirmed that there was no need for expensive shaker-table testing.<\/p>\r\n<p>The assessment demonstrated that seismic loads would not result in any damage to the equipment and that the equipment would operate as-designed after the postulated seismic event.&#160; Therefore, no redesign required.<br \/>\r\n<\/p>","protected":false},"excerpt":{"rendered":"<p>&#160;&#160; This project involved seismic qualification of over-pressure release doors, air filter units and other equipment to ensure continued fitness for service following a postulated seismic event. Initial investigation showed the components to suitable for analytical assessment using hand calculations.&#160; Thus a cost effective solution was identified early in the assessment process and it was &hellip; <a href=\"https:\/\/johnbrear-plantintegrity.com\/?page_id=524\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Seismic qualification of PWR components<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":107,"menu_order":6,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-524","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=524"}],"version-history":[{"count":2,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/524\/revisions"}],"predecessor-version":[{"id":527,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/524\/revisions\/527"}],"up":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/107"}],"wp:attachment":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}