{"id":145,"date":"2015-11-19T11:02:20","date_gmt":"2015-11-19T11:02:20","guid":{"rendered":"http:\/\/johnbrear-plantintegrity.com\/?page_id=145"},"modified":"2019-01-12T18:23:51","modified_gmt":"2019-01-12T18:23:51","slug":"safety-risk-and-reliability","status":"publish","type":"page","link":"https:\/\/johnbrear-plantintegrity.com\/?page_id=145","title":{"rendered":"Safety, risk and reliability"},"content":{"rendered":"<figure id=\"attachment_386\" aria-describedby=\"caption-attachment-386\" style=\"width: 475px\" class=\"wp-caption alignright\"><img fetchpriority=\"high\" decoding=\"async\" src=\"http:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/Background-RCA.jpg\" alt=\"\" width=\"475\" height=\"190\" class=\"size-full wp-image-386\" \/><figcaption id=\"caption-attachment-386\" class=\"wp-caption-text\">Hydro-electric generator during maintenance<\/figcaption><\/figure>\r\n<p><strong>What if it fails or malfunctions?<br \/>\r\n<em>Safety, risk and reliability management<\/em><\/strong><\/p>\r\n<p>Specific safety assessments may be required as part of the design process, or at any stage through life \u2013 particularly after any off-design incident.<\/p>\r\n<p>Safety, environmental, business and engineering risks are addressed by the complementary disciplines of risk-based inspection and reliability-centred maintenance.<br \/>\r\nThese are fully integrated into the phased approach to remaining life assessment.<\/p>","protected":false},"excerpt":{"rendered":"<p>What if it fails or malfunctions? Safety, risk and reliability management Specific safety assessments may be required as part of the design process, or at any stage through life \u2013 particularly after any off-design incident. Safety, environmental, business and engineering risks are addressed by the complementary disciplines of risk-based inspection and reliability-centred maintenance. These are &hellip; <a href=\"https:\/\/johnbrear-plantintegrity.com\/?page_id=145\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Safety, risk and reliability<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":418,"menu_order":5,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-145","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=145"}],"version-history":[{"count":6,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/145\/revisions"}],"predecessor-version":[{"id":504,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/145\/revisions\/504"}],"up":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/418"}],"wp:attachment":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}