{"id":141,"date":"2015-11-19T11:01:24","date_gmt":"2015-11-19T11:01:24","guid":{"rendered":"http:\/\/johnbrear-plantintegrity.com\/?page_id=141"},"modified":"2019-01-12T18:11:42","modified_gmt":"2019-01-12T18:11:42","slug":"remaining-life-prediction","status":"publish","type":"page","link":"https:\/\/johnbrear-plantintegrity.com\/?page_id=141","title":{"rendered":"Remaining life prediction"},"content":{"rendered":"<figure id=\"attachment_382\" aria-describedby=\"caption-attachment-382\" style=\"width: 475px\" class=\"wp-caption alignright\"><img fetchpriority=\"high\" decoding=\"async\" src=\"http:\/\/johnbrear-plantintegrity.com\/wp-content\/uploads\/2019\/01\/Background-HRSG.jpg\" alt=\"\" width=\"475\" height=\"190\" class=\"size-full wp-image-382\" \/><figcaption id=\"caption-attachment-382\" class=\"wp-caption-text\">Great Yarmouth CCGT plant<\/figcaption><\/figure>\r\n<p><strong>If so, for how long?<br \/>\r\n<em>Remaining life prediction<\/em><\/strong><\/p>\r\n<p>For many components, time or cycle dependent degradation processes \u2013 such as corrosion, fatigue and creep \u2013 cause progressive deterioration that eventually renders the equipment unsuitable for continued service.<\/p>\r\n<p>An understanding of these mechanisms together with a knowledge of the operating conditions allows prediction of the life remaining.<\/p>\r\n<p>For efficiency and economy, a <a href=\"http:\/\/johnbrear-plantintegrity.com\/?page_id=432\">phased-approach<\/a> is adopted.<\/p>","protected":false},"excerpt":{"rendered":"<p>If so, for how long? Remaining life prediction For many components, time or cycle dependent degradation processes \u2013 such as corrosion, fatigue and creep \u2013 cause progressive deterioration that eventually renders the equipment unsuitable for continued service. An understanding of these mechanisms together with a knowledge of the operating conditions allows prediction of the life &hellip; <a href=\"https:\/\/johnbrear-plantintegrity.com\/?page_id=141\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Remaining life prediction<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":418,"menu_order":3,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-141","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=141"}],"version-history":[{"count":7,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/141\/revisions"}],"predecessor-version":[{"id":500,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/141\/revisions\/500"}],"up":[{"embeddable":true,"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=\/wp\/v2\/pages\/418"}],"wp:attachment":[{"href":"https:\/\/johnbrear-plantintegrity.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}